Trials
This simulates the early warning , , information exchange and decision making in the context of flooding in the area of The Hague, Netherlands. It features several sub-scenarios, related to:
- Threat Phase - early warning and setting up of the management (2-5 days before )
- Impact Phase - the lock of Scheveningen collapses, the dikes near Wateringse Veld and Leidscheveen are threatened. Many citizens to be rescued.
- Cascading effects - flood results in water pollution power outages and telecommunications failures.
The of the DRIVER+ 1 includes a massive cross-border release of liquid toxic substances as a result of maintenance failure in a reservoir collecting chemical wastes. Two crises management centres on both sides of the border and the on-site operation commanding centre based in the field have to exchange information and coordinate their activities in the phase of the .
The of 2 simulates the to a large forest fire in a typical Mediterranean environment (South-East of France, Bouches-du-Rhône department, Alpilles area). The severit of the fire requires cross-border coordination and information exchange across organisational and state borders as well as along the command chain.
The central area of Austria has been struck by a heavy earthquake and subsequent heavy rains! The local region of Eisenerz (in Styria, Austria) is one of the most affected with missing persons, casualties, collapsed buildings, blocked roads, and endangered industries working with hazardous substances. simulates the large-scale to the involving the national organizations, international assistants and a large amount of spontaneous volunteers.
Portfolio of Solutions web site has been initially developed in the scope of DRIVER+ project. Today, the service is managed by AIT Austrian Institute of Technology GmbH., for the benefit of the European Management. PoS is endorsed and supported by the Disaster Competence Network Austria (DCNA) as well as by the STAMINA and TeamAware H2020 projects. |